When the scaffolding is dismantled, the striking façade construction is gradually revealed.
This moment of slow unveiling is exciting for the architects and those involved as well as for the neighbouring residents.
Together with Boltshauser Architekten AG, feroplan engineering ag developed a façade construction with a horizontally arranged photovoltaic system that also serves as geometric sun protection (Brise soleil).
Completion of the façade of the H1 tower block in Zwhatt is scheduled for the end of 2024.